


- Energy efficiency (up to 75% better efficiency).
- Small footprint of 1m x 2m x 2.4m/1.4m (D x W x H).
- No civils required (Can be placed on skids/trailer/underground).
- Can be run off a generator.
- Startup power draw significantly reduced.
- Low weight (No heavy craneage required).
- Low noise and low vibrations.
- Quick startup or shutdown sequence.
- Can be retrofitted to existing infrastructure at minimal cost.
- Logistical quantities reduced.
- Improved liberation due to particle shape and breakage mechanism.
- High reduction ratios in a single pass.
- Short lead time (12-14 weeks from order).
- Quick installation time.
- Low safety risk (no external moving components).
- Flexible operating parameters.
- Control over product size.
- Wet or dry milling.
- Safe, simple and quick change out of wear parts.
- High productivity and increased availability.
- Control panel and mill shipped as a turnkey solution.
- Stackable for redundancy and maintenance.
- No specialised equipment required for installation or maintenance.
- Reduced capital cost.


Email: info@edsza.com
Tel: +27 11 784 2331
edsza.com